![]() ![]() This has been verified in the field, with thousands of meters of translation without a single translation malfunction. It runs on patent-pending rails that ensure the system will translate effectively even if the array or rails are poorly installed, with straightness tolerance up to 50 mm out of square over 3 m. The NOMADD can be either retrofit-installed or integrated with understructure at the design phase. How is it installed and how does it move through the module surface and array of modules ? Can it be physically moved from one array of modules to others, or do we need a cleaning system per array ? The system envelope for a 3.2m width array is a box 3.6m x 0.3m x 0.3m. What are the dimensions and weight of the cleaning system? In almost all cases using inputs that recognize low labor and power prices in the region, NOMADD still provides a net present value of more than $100,000 per megawatt installed.Ģ. We work with the customer to measure and define their unique input variables such as the value of electricity, the cost of cleaning per kW using other methods, and calculate a yearly value-add of the NOMADD system for their project. Substantial work has been done to model both manual cleaning costs and the effects of cleaning cycle lengths of greater than a single day in the presence of high background soiling rates and dust storm events. Unit prices are related to the increase in the profitability of panels. How much does The NOMADD cost, and what are the spare parts cost ?īetween 3-5c per Watt installed, with very low spare costs. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |